Protect Habitat (2)
Limit all site disturbance by delineating construction buffer zones.
- Unitized materials
- Small staging requirements
- Less displaced soil
- PICPs reduce runoff impact to surrounding ecosystems
| CalGreen | |
| CHPS | |
| GGlobes | 2.3.2.1: 5 pts. |
| SITES | |
| BDCv4 | |
| BDCv4.1 | |
| NDv4 | GIB Minimized site disturbance: 1 pt. |
| CommP&D | |
| Applicable Products / Systems |
|
Pavers are immediately usable after installation and may be utilized for their own self-contained staging as work progresses.
Protect Habitat